
Some time ago, the Peru San Guan hydropower station project contracted by China Water & Power Foreign Co., Ltd. purchased the relevant water supply and drainage equipment--PPS.KR integrated prefabricated pumping station from Shanghai Kere Company.
The integrated prefabricated pumping station is highly integrated, built on demand, efficient sewage discharge, small footprint, short construction period, long service life, unattended, strong anti-seepage ability, fully buried installation, low long-term operation cost, high degree of automation integration.


After about two months, the pump station was installed and put into use after sailing from the wharf at the mouth of the Yangtze River in Shanghai to the San Juan District in Peru. At present, the pump station is running well and has achieved the expected efficiency and content perfectly.
The equipment is 6 meters high and 1.6 meters in diameter, with a dual pump system (the pump brand is Selmer) and two integrated prefabricated pumping stations.
It is believed that in the near future, the Corre integrated prefabricated pumping station will bring more economic and social benefits to the St. Gawan hydropower project and make positive contributions to the development of global clean energy industry.
