From Workshop To Site: How KORE Delivers A Ready-to-Install Pump Station

Nov 20, 2026 Leave a message

KORE integrated prefabricated pump station with stainless steel control panels

When a prefabricated pump station leaves our workshop, it should arrive as a complete working system - not as a set of parts still waiting to be assembled on site. At KORE, every integrated station goes through factory assembly, inspection and matched packing before it is loaded for delivery, so the work that would normally slow a project down happens before the unit reaches your site.

1. Factory assembly and inspection

  • Tank shell - dimensional check and tightness inspection are completed before the pump set is installed into the tank.
  • Pump set - each submersible pump is run-tested, with impeller rotation and the free travel of the guide-rail assembly checked.
  • Control panel - wiring, insulation and terminal connections are checked, then a simulated level signal is used to confirm automatic start/stop and alarm output.
  • Accessories - guide rails, lifting chains, valves, flexible couplings and the maintenance platform are verified item by item against the packing list.

Side view of the finished GRP pump station tank

2. Matched packing

Pumps, control cabinet, valves, flexible couplings and pipe fittings are packed as one matched set with a detailed packing list, so nothing is missing when the container is opened on site. Fragile components are protected separately, and the control cabinet is packed to stay dry during transport.

Supplied package: submersible pump, control cabinet and flexible pipe coupling

3. Loading and shipping record

Before loading, the finished unit is photographed and documented - front view, side view, nameplate and the accessory package - and these records are shared with the customer as a pre-shipment confirmation.

Finished station loaded for shipment

4. On-site support

The station is lowered into the prepared foundation, connected to the inlet and outlet piping and powered up. Our engineers provide installation drawings, lifting guidance and remote commissioning support, and can arrange on-site assistance for larger projects.

Pump station being lifted into place on site

Typical projects we deliver to

Municipal sewage lifting · Urban stormwater and flood pumping · Residential and commercial drainage · Industrial wastewater · Rural and township sewage treatment · Water supply booster stations

Planning a wastewater lifting or stormwater pumping project? Send us your flow, head, installation depth and site conditions, and our engineers will prepare a suitable configuration, delivery schedule and shipping plan for your project.

Contact KORE

Tel / Hotline: +86 400-820-7055
Email: silas@korepumpstation.com
Web: www.korepumpstation.com
Manufacturer: Shanghai Kelei Fluid Automatic Control Equipment Manufacturing Co., Ltd

#IntegratedPumpStation #PrefabricatedPumpStation #GRPPumpStation #QualityControl #SewageLifting #StormwaterPumping #PumpStationDelivery #WaterInfrastructure #PumpManufacturer #KOREFluidControls

Send Inquiry